Our kitchen is almost finished. Here are some pictures showing the progress from the beginning.
- The basement being dug. The job was done under the guidance of our relative Kuttan
- Work of the basement : another view
- Basement finished. Kuttan, our relative made those concrete pillars
- Frame progressing with casuarina poles.
- Paving tiles : Gautham and Harish
- Roof completed. Wall is partially done.
- It took two years before we could continue the work. The wall that was built was destroyed by dogs, and stray cattle. (2013)
- Hiranya looks on while Gautham is busy building the arches that will support the ovens.
- Template for the arch made with loose soil and covered with cloth.
- Placing the bricks on the template
- Bijesh lal preparing mud for the brick wall
- Building the walls. Windows and shelves with arches.
- Little helper making tile pieces for levelling.
- Building walls
- Anu and Hiranya polishing the plastered mud with round stones. Technology borrowed from the tribals in the region
- Time for floor
- Floor progressing
- Walls whitewashed. Notice the glass pieces filling the gap between the wall and roof.
- The iron frame : another precaution against termites.